Try switching from Virgin to BT/openreach FTTx and you'll probably see much more reliable speeds.
FWIW I have hyperoptic in London which is ~£45/month for 1gigabit up and down.
edit: keep in mind the NZ project cost NZ$1.5bn subsidy to get to 87% penetration for ~1million premises. The UK has got to 95%+ penetration (>20million premises) for £600m ish subsidy. It's literally 20x the cost.
even if i wanted bt fibre, i live in the center of a large city in the uk, and i cant get fttc because im on the wrong street. one street over they can get fibre, mine, not a chance - and no plans to according to openreach either. similar issue with where our office is located. wrong street. no fibre. a few streets over, fibre.
virgin on the other hand, i have their 200/20 package. consistently max out the connection no problem. had them for years and they've consistently performed above expectations - i even remember when they were called blue yonder.
Apart from downloading backups, I never find myself constrained by 70mbit download speed.
Is BT still have awful bandwidth limits? Because like 3-4 years ago they capped you at like 300GB and then cut your speed next month or something like that.
I just got letters from them telling they'll decrease my level of service since I got over 300GB this month, but that was 4 years ago and on xSDL (many areas fairly close to London city still had only xDSL then).
Keep in mind BT is starting an aggressive Gfast rollout and has a slow and steady FTTH program also running. Personally I don't think it's worth the UK govt spending £30bn+ on FTTH as I believe the commercial sector will get there, especially when FTTC is so widespread.
The upload does matter with everyone uploading videos and high resolution pics plus game streaming. It also helps a ton if you have the odd 200GB genome you need to archive somewhere :)
It adds up. Copper is far less reliable at distance than fiber (the amount of people able to get 80mbps is < 10%).
And government is totally incentivized to spend money on a natural monopoly with an immense RoI. Rural areas are basically disconnected from high end internet activities. If you build a fast national network, it will pay off.
And for the record, the cost to full fiber the UK is less than the government plans to spend on HS2, a single rail link between birmingham and london.
Parents streaming video - assume 4K HDR (even though virtually nil content is in that) = 25mbit/sec
Twitch = 2mbit/sec (upload, but for the sake of argument, assume it was download)
Add in 10mbit/sec for browsing, updates etc and you're still at 45mbit/sec.
More than 55% of the UK can get >100mbit/sec currently - definitely not <10%: https://www.thinkbroadband.com/news/7918-january-update-on-s....
I know coworking spaces that operate with around 100 people on 100/100 internet with little problem.
My grandmas old village in probably the most rural area of NW england can get 80/20mbit broadband (very close to cabinet). If you genuinely think that uncapped 80mbit/sec cuts you off, I don't really understand what you're saying.
HS2 is a very important project and I would much rather that be funded than spending billions on slightly faster internet.
Whos going to pay for this extra infrastructure.
and why does consumer bb speeds effect th UK's status as a leading tech nation - not treating engineers and scientists as second class citizens would do far more.
BT also has a massive leased line base in these areas they want to maintain.
I agree this is really poor and BT should resolve this ASAP.
This sort of conversation can get a bit depressing.
My problem with VM is their constant bumping of prices. Until recently I was paying MORE than a new customer (by quite a margin).
You have to keep an eye on your bills
Isn’t that effectively what happened with BT and Openreach? In a large town or city you are usually ok, but any further out you have a lack of choice and pretty poor (for 2018) speeds.
Really, OpenReach is the old Postmaster General's department, after a privatisation and a couple of renames. Except they now take three weeks instead of six months. The engineers are great, too - people who see their job as keeping things working.
I've got Virgin in London and it's a piece of shit compared to what I had in NZ. In theory, I have 200mb down, but the uplink is bullshit because they convert to cable for some unknown reason. I also rarely see the performance that a 200mb connection should have. In NZ I had, in the first days of fibre, 30 down 10 up. It was always this speed, the fibre terminated at my house and was more responsive and reliable than what I have now in the UK.
Here, the govt keeps kicking around, getting conned by the industry as they promsie to upgade things, to be better. It's such a joke.
For reference these are real plans, with reliable speeds, with FTTH: https://imgur.com/a/8JeV7 (divide amount by 2 for £, take off 30%ish for USD)