a classic waterfall approach where somebody writes a big spec, a team spends a bunch of time implementing, and then sometime at or after the deadline, a working model is produced.

...which is actually quite suitable for the safety-critical parts of a car like the ECU and other controllers that control the actual driving aspect, but not for everything else that doesn't need such a level of process.

On the other hand, I suppose it could also be blamed on the lack of "performance is a feature" --- if they specified the radio to be as responsive as the accelerator and brake, for example.

Re:Norway switches off FM radio, but a station is defying go... by wpietri on Sunday December 17, 2017 @10:05AM (#15945996)
I think the choice of process is basically orthogonal. Waterfall and Agile processes done well both have been demonstrated to produce safety-critical software. (See, e.g., Nancy van Schooenderwoert's work in medical devices.) Both can produce dangerous software. (E.g., Toyota's "unintended acceleration" issues.) The question is much more about what practices you put in place to assure quality.

I do think short-cycle methods have some intrinsic advantages, though. By making critical functionality available much earlier for testing, you get more time and more chances to make sure it's really safe. If early versions are bad, you get early warning signs that aren't available in a Waterfall process. And if testing turns up issues early on, it's much cheaper to make fundamental architectural changes: less code to change and more time to change it in. And Waterfall processes aren't at good at dealing with unknown unknowns; some things you only learn by trying them out.