I would say the automatic transfer switch should be configured conservatively and go to backup power at the first hint of instability. If irregular power is the usual cause of downtime then I would expect the ATS to cope with those conditions, or it gets replaced with one that will.
Good point about the lack of variability. Not sure if the generators would take kindly to suddenly switching out a 1 mw dummy load to free capacity for real load.
On the other hand, it's not like these engines have fixed RPM throttles, and they should be able to handle a wide range of loads, albeit not at peak efficiency. Something doesn't fully make sense about that story. Maybe the generators were sized for their ultimate planned capacity and thus way too much for their deployment at the time.
Re:OVH outage explained
by ADefenestrator on Monday November 20, 2017 @05:29PM
(#15743924)
I thought large diesel generators generally did operate at a fixed speed in order to output 60Hz. I know inverter/generators are common these days for small gas gensets, but have the big diesel ones switched over as well?
Most downtime I've seen in datacenters has been due to irregular power, not power loss. Case in point.
Dummy loads are good for testing but they are not typically variable - if you had 2.5mva generators and a 1mw dummy load you wouldn't be able to run more than 1mw of critical IT load.
I'll say this is the first I've heard of not having enough load to start a generator. They will happily start up and idle.