Re:Drone footage of Seattle's new 57 foot SR 99 tunnel [video]
by pygy_ on Saturday October 21, 2017 @02:55AM
(#15520972)
> Tunnels digging costs are roughly proportional to the square of their diameter
Given a constant length and homogeneous ground composition (conditions that apply to the current discussion)... It makes a lot of sense that the cost is proportional to the volume being removed.
Re:Drone footage of Seattle's new 57 foot SR 99 tunnel [video]
by mulmen on Saturday October 21, 2017 @04:00PM
(#15523343)
There has to be more to it than just homogenous ground composition. Surely drilling into granite is harder than clay or something? Also my understanding was that the SR99 tunnel is through both fill and clay.
Re:Drone footage of Seattle's new 57 foot SR 99 tunnel [video]
by pygy_ on Saturday October 21, 2017 @04:18PM
(#15523411)
I may not have used the best phrasing:
For a given tunnel length and ground composition, the cost is proportional to the area of the cross section.
Re:Drone footage of Seattle's new 57 foot SR 99 tunnel [video]
by mc32 on Saturday October 21, 2017 @01:37AM
(#15520828)
That's a great point, I failed to realize. This is a two-deck tunnel, so the price increase might not have been as steep.
In any event, some of the original proposals were for six lanes --wished they'd carried that out.
So a six lane tunnel probably cost more than twice of four lanes.