An A380 or 747 is significantly less nimble than a 737, and would take a lot longer to unload and load back up. The flight in question did a turnaround in 51 minutes, including taxing time, which is extremely quick.
It is, but I suspect you can significantly speed up loading if you skip all of the bullshit that makes loading take forever.
No people loaded down with multiple huge carryons, no checked luggage, no searching for your assigned seat, no zone loading bullshit, just everybody walks on the plane and sits down in the first available seats they find leaving no empty seats. Everybody lined up at the door ready to go the minute the plane is empty. You could probably have the whole plane loaded before it finished refueling.
Haha, Ryanair will beat that turnaround time in normal operations any day
The above comment is not a snide joke at Ryanair, here's an article citing their turnaround times from the early 2000s: http://news.bbc.co.uk/1/hi/business/2962698.stm
This is still the case.
Ryanair's been criticized for safety issues over their 25-30 minute turnaround times, which don't count taxiing time.
They had empty seats on the flight out. I'm pretty sure a 747-400 or A380 would have been wasted fuel and increased risk (due to size).
I have no insight into what kinds of planes are normally flown in and out of San Juan, but the plane has to be able to take off/land on the runway in question, the facility has to be able to service (maintain, fuel, provide jetways/stair cars for, etc) the plane, .. you don't (typically) just pick a random plane, fly it into a random place, and fly it out.
An evac flight could even go full on quick load. No checked bags, one carry-on max, forget assigned seats and just fill the plane from back to front as fast as possible to get out of dodge.