https://web.archive.org/web/20001204191400/http://www.lhpo.o...
and specifically:
https://web.archive.org/web/20010215034409/http://www.lhpo.o...
"2.3 Gas installation:
The LHPO runs only on propane, at full bottle pressure (that is, five to ten bars, depending on ambient temperature).
The LHPO may be run from either a bank of propane bottles feeding into a manifold and then proceeding along a main gas pipe to the organ, or from a single propane tank with either liquid or gas feed. If liquid feed, a gasifier must be provided with sufficient peak capacity (see below).
If a single tank, the tank must have at least a three ton filled capacity, to provide enough thermal mass for the required gas delivery rate (see below). The tank connection must be at least 1 1/2 inch inside pipe diameter, to provide for sufficient gas delivery rate.
If a multiple tank installation, at least 28, 33kg capacity bottles are needed. The bottles may not be all close packed into a rectangular array, but must be in one or two rows, with adequate air circulation around the bottle area to provide for heat transfer to the bottles.
If a liquid phase system and a gasifier are to be used, the system must be able to deliver the peak delivery rate (see below) for at least ten minutes continuously."
If the vaporising gas was ignited, some of the heat from that combustion would certainly be transmitted to the pool of cold, liquid gas by radiation which would increase the vaporisation rate. The net result would still be a release of energy into the surroundings over probably tens of minutes (as opposed to microseconds in the case of a nuclear bomb).