https://en.wikipedia.org/wiki/Airbus_A350_XWB
(On the other hand, Airbus already had a lot of experience with composites in airliners, so the A350 was an evolutionary development, not a revolution: and they'd been working with international airliner component supply chains for decades already — it's what they do — so they didn't have to start from scratch.)
My point is, the $30Bn sticker on the 787 is misleading because it covers not only a new wide-body airliner type but also a whole new supply chain management approach and a (for Boeing) revolutionary change in materials technology (from mostly-Al to mostly-carbon fiber composites).
Airbus also had the same kind of experience and expertise in house already built up. So, that doesn't challenge the GPs contention that for someone without that, the cost would be substantially more.
So the $30Bn sticker for the Dreamliner gets you not only a new wide-body airliner, but a whole new global airliner manufacturing supply chain (you bet they'll use it — or a development thereof — for the next airliner they design, too), and the capacity to punch them out like pick-up trucks.
This $33M funding round is to build a one-third scale flight demonstrator. Not an actual Boom airliner, or a Concorde equivalent, but something like like the HP.115 — a research aircraft with similar flight properties in some parts of the flight regime of the planned final aircraft, for test purposes:
https://en.wikipedia.org/wiki/Handley_Page_HP.115
(Significant difference: the HP.115 was used to investigate low speed stability and handling of delta wings. The Boom XB-1 is to investigate supersonic low noise flight.)
It also lets them build up their engineering team to the point where they're actually able to get a full grasp of the magnitude of the problems they're facing.
But a real Boom supersonic transport? That's going to cost at a minimum multiple single-digit billions (even if they don't go all-out and budget for a production line and supply chain for 2000 units) to develop.