That's not the point of this funding round. When you work on insanely ambitious projects you have to do things incrementally.
This is their 3rd round - the first was $120k, the second was $2.1m. Each round enables them to do enough of the tasks that demonstrate to investors that they're capable of doing the next set of tasks. I have no clue how you design a plane but I would guess the first round was entirely spent on modelling the financials and market research to see if there's even a business opportunity. The next round would be something like the really broad brush ideas for how you'd make a plane like this. This round will be spent digging in to the technology itself, figuring out what capabilities you need to have in an electric plane, and finding which parts you can buy off the shelf. If Boom are successful at that then there'll be future rounds that are spent on actual design and manufacturing.
By the time anything real takes off from a runway they'll probably need to have raised billions.
No one thinks you can design and build a plane for $120k+$2.1m+$33m.
From the article:
>“This funds our first airplane, all the way through flight tests,” explained Boom founder and CEO Blake Scholl in an interview.
So the $30Bn sticker for the Dreamliner gets you not only a new wide-body airliner, but a whole new global airliner manufacturing supply chain (you bet they'll use it — or a development thereof — for the next airliner they design, too), and the capacity to punch them out like pick-up trucks.
This $33M funding round is to build a one-third scale flight demonstrator. Not an actual Boom airliner, or a Concorde equivalent, but something like like the HP.115 — a research aircraft with similar flight properties in some parts of the flight regime of the planned final aircraft, for test purposes:
https://en.wikipedia.org/wiki/Handley_Page_HP.115
(Significant difference: the HP.115 was used to investigate low speed stability and handling of delta wings. The Boom XB-1 is to investigate supersonic low noise flight.)
It also lets them build up their engineering team to the point where they're actually able to get a full grasp of the magnitude of the problems they're facing.
But a real Boom supersonic transport? That's going to cost at a minimum multiple single-digit billions (even if they don't go all-out and budget for a production line and supply chain for 2000 units) to develop.
https://en.wikipedia.org/wiki/Airbus_A350_XWB
(On the other hand, Airbus already had a lot of experience with composites in airliners, so the A350 was an evolutionary development, not a revolution: and they'd been working with international airliner component supply chains for decades already — it's what they do — so they didn't have to start from scratch.)
My point is, the $30Bn sticker on the 787 is misleading because it covers not only a new wide-body airliner type but also a whole new supply chain management approach and a (for Boeing) revolutionary change in materials technology (from mostly-Al to mostly-carbon fiber composites).
Airbus also had the same kind of experience and expertise in house already built up. So, that doesn't challenge the GPs contention that for someone without that, the cost would be substantially more.
That would be, well, most of the regular startups too. The problem is, you can't tell everyone you're aiming for an exit, because exit == fucking over your existing customers, and you need those customers to be able to exit. So, startups lie about how they care about the users and their product.
That's why nowadays I assume by default that a startup is just done for exit, unless proven otherwise.