Re:Tesla brings online its 80 MWh Powerpack station with SoC...
by jws on Monday January 23, 2017 @09:17PM
(#13468283)
The recently rebuilt (2010) Taum Sauk reservoir only manages a 70% efficiency according to Wikipedia. I'm not seeing a number published for the Powerpack but I'd guess a 90% ballpark.
This battery project can be built in small increments and does not require local land in a proper geometry that can be flooded. Most good pumped storage possibilities in the US are built out already. Pumped storage also wastes more of the stored energy.
It took 7 years to build the hydro facility? Wow.