Re:World Energy Hits a Turning Point: Solar That's Cheaper T...
by jartelt on Friday December 16, 2016 @11:42AM
(#13194498)
I wouldn't be so quick to dismiss the maintenance cost for a ARES-type rail system. For pumped hydro, your ongoing maintenance is largely going to be maintaining a pumping system (to send water up) and a generator system. Hopefully you build your reservoir properly so that it lasts for 30 years. For rail, you have to have to maintain a large number of moving parts. It won't be cheap to insure all the parts are greased and good to go. I think it's a lot easier to maintain a set of pumps and generators than it is to maintain what is essentially a rail fleet filled with gravel on a mountain.
[ Parent
| on HN ]
Re:World Energy Hits a Turning Point: Solar That's Cheaper T...
by evgen on Friday December 16, 2016 @12:18PM
(#13194840)
So for pumped hydro you have a massive up front cost and potentially smaller maintenance. Maintaining a large number of moving parts for rail might seem daunting, but these rail cars are made to operate for very long periods of time in unpleasant conditions with minimal maintenance; topping up lubrication systems and visual inspection is basically covering monthly maintenance for the system. I am not sure what the ongoing maintenance cost for most hydro installations is (pipe inspections, anti-silting and other water maintenance, inspections of the system, etc.), but I had to guess I would say that it is probably quite similar to rail.