Re:The Future Google Rackspace Power9 System
by coredog64 on Monday April 11, 2016 @08:24AM
(#11471014)
I don't have the link handy, but within the last month or two there was a story here on HN about a company (Facebook?) that determined it was better to go small on hardware. Which is to say that one or two socket servers were more of a sweet spot than 8 socket monsters, at least for generic loads.
That was Facebook. Again backing up the same reason why ARM didn't manage to penetrate Server Market yet. The story was about Web Server which needs not a lot of CPU power, decent amount of memory and good networking. When anyone think of low power CPU they immediately think ARM has a fighting chance here. Before ARM even got a foothold in the Server market Intel responded with an Atom Server CPU. It turns out the market needed a more powerful CPU then they thought. Intel came again with Xeon-D, with has 2 to 8 Core, and integrated 10gbps Ethernet support at a low power consumption. It was an instant hit and it is now selling like hotcakes. They have recently updated with even 16 Core. You can stack 8 - 10 of these in 2U Microblade.
Again when you take into account of power, performance, and other parts of the Server components, the TCO of CPU is relatively small. Even if you gain 10% of TCO improvement, you have to factor in the future roadmap of the CPU, as well as the Software development, compiling and testing cost involved.
Purley Platform, Skylake Xeon offers:
Up to 8 Socket and 28 Core per Socket 6 Channel Memory Controller, 12 DIMM per Socket Support of Intel Xpoint NVDIMM 48 PCI-E Gen3, OmniPath 100G Connection
Offers up to 1.5TB Memory on a 2S Server, or 6TB Xpoint. If you push to the limit of 128GB TSV DRAM and 512GB Xpoint, that is potential of 3TB on 2S Server and 12TB of Xpoint.
Not to mention Intel's Network Controller. The Whole ecosystem from Intel Cloud is actually quite amazing. Both from Hardware innovation and Software Compiler they are working on. It is the same lock in as the PC Windows industry, and unless you get a dramatic new way of doing things. You cant simply switch the Mobile Industry to x86 or vice versa all by yourself. Even if you are as big as Google. Then you get 10nm Intel Server in 2018/2019.
Again, I dont see the incentive making the switch.