https://apps.fcc.gov/oetcf/els/reports/STA_Print.cfm?mode=in...
All the pieces are coming together for the next launch, now.
One itty-bitty nitpick. There's one more F9 1.1 launch scheduled: Jason 3 set to launch out of Vandenberg as the 3rd launch after they resume. After that the old ones are done, though.
That is going to require sources. Primary responsibility for quality is going to have been the original manufacturer's. SpaceX of course will have had to (and I don't believe didn't) done their own check testing of components, but you write a contract with a supplier to put the risk on them for the timely supply of to-spec and to-tolerance parts.
And then you take it to your supplier when they've failed to meet their contracted failure rates, which could also be called "tightening up your supply chain."
I'm sure there'll be more quality involvement on SpaceX's side but I'd be awfully surprised if they weren't generally following industry standards.
Failures of novel engineering happens sometimes.
The Falcon 9 explosion, Space-X claims, was due to a strut being far under-strength. When they tested their inventory of struts made by a contractor, some failed at 20% of the rated load. Space-X hasn't provided further details. They claim to be "tightening up their supply chain". That probably means requiring 100% traceability of every structural part back to the raw material and much more testing at incoming inspection. This is standard in aviation (which is why structural failure airplane crashes of production aircraft are very rare) but something Space-X wasn't doing.
One wonders what other problems they've found as they put part after part through strength tests. Probably more than they've admitted, or they'd be launching by now.
[1] http://spaceflightnow.com/2015/09/01/falcon-9-rocket-to-be-g...