Re:Ask HN: How to Be a Good Technical Lead?
by hinkley on Thursday October 15, 2015 @11:47PM
(#10397363)
My biggest energy expenditure is usually right at the beginning of a release cycle, or even a week or two before it when our process is working correctly (a good process means a boring release week).
We will have figured out some big infrastructure or design issue we need to fix and between requirements meetings we code like hell. Blocking people during week 1 or 2 goes a lot better than week 8 or 17.
We will have figured out some big infrastructure or design issue we need to fix and between requirements meetings we code like hell. Blocking people during week 1 or 2 goes a lot better than week 8 or 17.