shazmosushi
There should be an quick command-line utility to concatenate multiple video files according to exactly the timestamps the user has provided. It's such a common operation.
There's no reason that the tool can't simply do a streaming decode of multiple different file formats and concatenate the video and sub-second precision. If input video resolutions are different, scaling the smaller video to the largest resolution is what the user almost always wants.
I get that FFMPEG is a "plumbing" CLI tool, but a "porcelain" wrapper would be amazing!
I wish there was a scriptable / command-line interface for HandBrake (which is already based on FFMPEG) [1], where the user just provides the high-level commands: 99% of the time I want to specify high-level commands: extract clip from this timestamp, including SRT subtitles, crop to this geometry, and shift the audio by 3 seconds.
I believe they can just burn extra fuel margin to do a traditional vertical landing though. It costs payload, but it should be doable.
When maximizing cargo delivery to the surface of Mars, I'm sure they'll always do the flip.
He's just released a book on the early days of SpaceX [1] that appears to be the definitive account, according to the early reviews.
I'm not associated, but I have been wanting to read his book and am happy it has finally been released! :)
[1] https://www.amazon.com/Liftoff-Desperate-Early-Launched-Spac...
Rocket Lab never wanted to do first stage recover on the Electron, but they later chose to and have succeeded in soft ocean landings under parachutes and will soon try and catch the parachutes with helicopters.
I fully expect they're are running the numbers on second stage reusability but unlike SpaceX [1] they don't tend to announce things until they are sure that's what they will pursue.
Rocket Lab only promised the Neutron will do 8,000kg to low-Earth orbit, and people are suggesting the rocket tanks can be stretched for added performance.
If SpaceX wasn't pursuing Starship they would continue to spend resources on second stage reusability for the Falcon 9. Even less than 2 years ago Elon Musk was still talking about using a ballute to recover the Falcon 9 second stage [1], but they later decided to put all their resources into the Starship.
But yeah 2024 far enough away that Starship (and New Glenn) should be operational by then, so the competitive landscape may be different. But that's all the more reason for Rocket Lab to pursue second stage reusability.
If Rocket Lab achieve second stage reusability while delivering a lot of payload to orbit it would be revolutionary. Like it will take hundreds of flights for a Starship to become as cost competitive to just a few flights of the Neutron rocket.
If I was SpaceX, I would be worried. Rocket Lab is SpaceX's most fearsome competitor.
Rocket Lab deserves the praise it receives. More so than Blue Origin, an older company whith grander ambitions but has been unable to execute on anything beyond a few small scale suborbital hops. Their methalox BE-4 engine is admittedly pretty cool though.
Sucks for Red Dragon, but I'm looking forward to Starship!
So it's acceptable to have some skepticism that SpaceX intends to drop the Falcon 9's (already very cheap) marginal cost from $1000/kg by 100 times to $10-$20/kg through Starship's fully and rapidly reusable operation.
If anyone can do it, it's Elon Musk. But it's good to keep in mind his deep aversion to any sunken cost fallacies.
The Atlas V and Delta IV Heavy are being phased out in favor of ULA's Vulcan (which uses its BE-4 engines). Falcon 9 is otherwise dominant.
Despite sharing its BE-4 engines with ULA, New Glenn will eventually win a few national security payloads per year. If the economics of reusability pan out for them, they might eventually even beat the Vulcan!
We'll see if they can take their future taxpayer-funded first stages and launch commercial satellites with bargain basement internal costs, like SpaceX has achieved.
https://www.afrc.af.mil/News/Article/2305576/space-force-awa...
SpaceX was funded by Elon Musk and later, Draper Fisher Jurvetson and Peter Thiel's Founder's Fund. Starlink has been in part funded by a $1 billion investment from Google and Fidelity. And since then further funding rounds have been raised.
The DFJ and Founder's Fund investment was before SpaceX had any substantial NASA development contracts, let along their 2008 $1.6 billion launch contract.
EASA is the European Union Aviation Safety Agency. I think you meant to say ESA, the European Space Agency? But ESA's not that relevant here, as the European governments fund and develop launch services through Arianespace, a consortium of space industry companies led by the French aerospace companies Airbus and Safran.
Correction aside, I agree with your point that Arianespace did underestimate SpaceX.
I did some analysis based on these numbers in this 8 minute video here: https://www.youtube.com/watch?v=36o4UrS9OS4
The latest numbers are that the marginal cost of relaunch is $15 million, with $10 million of that the second stage. Refurbishment cost is 27 days with a $1 million refurbishment cost (not $250,000 as I mistakenly said in the video, see description). The net effect is the cost of marginal cost of reflight is approximately 25% but the payload reduction is 30%, which leads to a break even point of 3 launches. After 10 flights, the cost to orbit per kilogram is halved. SpaceX has demonstrated 8 flights of a single booster.
Note, these are all using SpaceX's own numbers (but so was the payload reduction and original reuse cost figures). It depends on recovering the $6 million fairing (which does not happen every mission). All numbers are sourced from an Aviation Week May 2020 podcast that I linked to. Yes, the cost numbers are from SpaceX but the only public refurbishment cost analogue we have is their 27 day turnaround time.
SpaceX are currently operating at a sixth of the rest of the industry and use their cost advantage to launch 60 Starlink satellites at their $15 million marginal cost.
The traditional military-industrial complex with cost-plus accounting is "subcontractors all the way down", and the incentives weren't aligned to make an industry dominating rocket until arguably the 1990s commercial satellite boom (eg, the original Iridium constellation). Until 2008, there hadn't ever been a privately funded rocket reach orbit ever. Until SpaceX. Prior rockets we designed, owned and approved by the US government under World War 2-era cost-plus accounting arrangements.