lrasinen
You can lead a horse to water, but ...
However, we're talking about companies that put unprotected systems on the public network and did nothing about it even after getting three weeks advance warning.
The fall of that system then came about when politically ambitious characters started developing more personal and long-term relations with their troops.
I'd say that's an argument for term limits: you want them to get good but not set roots permanently.
It usually kicks in when 10-20 % of the votes have been counted and switches back to raw results near the 90% mark.
Didn't find an exact date when they started using it; an article says "dates back to 1960s" but it's definitely been a staple in 2000s.
But if the very first thing you do on the construction site is disregarding the local laws and regulations, when they were explicitly told about environment assessment requirement, it's not exactly favorable first impression, is it?
Basically the law says you need to do the assessment if you're removing the trees permanently from over 200 hectares. The company asked for an exemption, the relevant bureau said nope, they cut anyway.
I worked with district heating, no idea what the cooling guys are/were doing. It's a big company.
Some sort of clove extract is used in dentistry as an temporary fix if a full root canal isn't feasible at the time. Got the tiniest whiff of that on my tongue during rinsing and it tasted downright toxic.
https://www.ceer.eu/wp-content/uploads/2025/02/3rd-CEER-Repo...
For reference, the Finnish voting experience is such that about a month before the election you get a card to your registered address, telling what the election is and what's your polling place. Then you show up on the day in question, show an ID, they check that against their list and off you go.
As an example, I pulled the stats for an electric locomotive. 19x3x4.4 meters, mass 90 metric tonnes. That's an average density of about 1/3rd of water.
Edit: I was wrong, the locations do have small (5-10 MW) district heating networks.
Sweden is currently split into four pricing areas due to lack of grid capacity. All the cheap electricity is typically in the north (hydro) and then the price creeps up when you head south.
It's too bad the live electricity flow data is offline today, but there's a common pattern where SE1 pricing area in the north sends little under 2 GW to Finland (single zone) and most of it gets exported to SE3 around Stockholm.
*) https://shkspr.mobi/blog/2025/06/gadget-review-treedix-usb-c...
Just make a stiff gel and hit it with a stick blender for desired consistency and lumpiness. This does introduce a lot of small air bubbles in it, so if you need clear slime let it stand for a few hours.
We already have a bunch of local non-interoperable systems, so what's one more?
Or if you like to have something modern, Paimio Sanatorium or Turning Torso.