eysquared
My feedback is merely: boy it'd be nice to have the option to just order a pre-built.
Building code for snow load is a factor of location and elevation here. We are around 130 lb/sq ft.
Roof pitch can help with shedding, but then you've got other problems (roof avalanches can and do kill, not to mention snow up against materials that don't want to be wet all winter).
I'm still planning on building out an office/studio, but it will be a much larger investment despite being able to DIY much of it.
LG TVs capabilities and performance from an app developer perspective is... not great.
Trump suspends trade loophole for cheap online retailers globally
US recommends encrypted messaging as Chinese hackers linger in telecom networks
Pop Culture
Apple, SpaceX, Microsoft return-to-office mandates drove senior talent away
US government’s reliance on Microsoft means the company gets a free pass
Apple wouldn't let Jon Stewart interview FTC Chair Lina Khan, TV host claims
Google lays off "hundreds" more as ad division switches to AI-powered sales
The cord that was attached to the clutch broke and got caught in the mechanism itself. When I disassembled the clutch to retrieve the cord, an internal spring came dislodged and twisted causing the clutch to never function correctly again.
Understanding exactly which part I needed replaced, I contacted Hunter Douglas, who told me to talk to a local rep. My local rep told me they couldn't repair this issue, and I would need to box up my entire window shade and sent it in. The cost was something around $200 for a repair.
I spent a lot of time scouring the internet and came across this site where I purchased the entire clutch for around $30. 5 minutes of swapping a good part for bad and I was back in action.
Google to pay Canada's "link tax," drops threat of removing news from search
A Garmin watch that allows for all interactions to be done via easy to find physical buttons and well thought out data screens was a huge improvement for my own use cases.
Google’s head of AR software quits, citing “unstable commitment and vision”
In places like this the engineers and managers closest to the product and customers tend to have a better feel for what to work on, but in a large enough org it’s impossible to align those priorities across teams to get things done. This leads engineers to either POC ideas that aren’t possible in production yet or to focus on smaller features that don’t have dependencies.
The blame there lies solely in upper level leadership who often care more about org size than output.
I’m tired of the messaging around “lazy workers” pointing the finger where it doesn’t belong. Gut from the top if you want to get rid of the problem. It’s not the L5 engineer or the first line manager that’s holding any product back. These people tend to be the most invested in building something in my experience.
Googlers angry about CEO’s $226M pay after cuts in perks and 12,000 layoffs
TikTok CEO fails to convince Congress that the app is not a “weapon” for China
The idea was to build scalable solutions for HR to modernizing hiring, etc. and productize those. I'm not sure the external product piece ever panned out, but they were mainly focused on eliminated manual processes for HR inside of Amazon and migrating legacy systems to modern ones.
Its not clear which roles will be eliminated, but I've worked in a few of those groups and I can assure you there is plenty of fat to be trimmed outside of engineering.