News for hackers. Stuff that matters.
Re:Crossrail: The monster tunnelling under London streets by zhte415 on Friday June 05, 2015 @08:50AM (#9665159)
The article mentioned £10 million per machine which, as a complete layman in these things, I found incredibly cheap, even assuming maintenance costs would likely out-weigh the cost of the machines.
Re:Crossrail: The monster tunnelling under London streets by ucho on Friday June 05, 2015 @09:19AM (#9665299)
For recently completed tunnel in Gdańsk the machine cost was €21 million while the total cost for drilling operation was around €220 million