Re:The Psychological Difference Between $12.00 and $11.67
by Tactic on Tuesday February 03, 2015 @11:16AM
(#8991163)
I never considered this with prices. Interesting.
Which is odd because I always consider this with project deadlines. Whenever I see deadlines of the 1st or the end of the month I know it is a date picked out of the air and not based on the actual work required.
Which is odd because I always consider this with project deadlines. Whenever I see deadlines of the 1st or the end of the month I know it is a date picked out of the air and not based on the actual work required.