Re:The Parable of the Two Programmers (1985)
by sshumaker on Monday January 26, 2015 @04:15AM
(#8946133)
I have to disagree here. This is definitely possible, especially on more greenfield projects. Most of the engineers on my team produced that much sustained. And my average is closer to 400/day even though a big chunk of my time is spent doing things other than programming (e.g. tech leadership / management).
LOC isn't a great metric though and can be easily gamed.
[ Parent
| on HN ]
There are no comments on this comment yet.