Re:Electricity stored as temperature difference
by ghshephard on Saturday November 22, 2014 @11:31AM
(#8645879)
Somewhere in the middle - the capital costs are $103/kWh - So, if you want to store 1 MWatt for 1 hour (Large Solar / Wind plant with variable sun/wind, and fixed size upstream transmission), it will cost you $103,000 fixed costs. OpEx is a function of maintenance, operation, life time, and duty-cycle of the plant.
There's probably a standard interpretation, but it's not obvious to a lay reader like me.