Re:Ponos – A simple yet powerful load generator in Erlang
by jool on Tuesday November 18, 2014 @05:34AM
(#8623302)
Sure thing. I guess you could even spawn a task that generates new load_generators. In that scenario I guess it could be useful to have the possibility to configure a load generator that terminates after the call_counter reaches a threshold.
[ Parent
| on HN ]
There are no comments on this comment yet.