by russell on Monday September 07, 2009 @10:47PM
(#810175)
It may be better, but it sure is taking forever. The original bay bridge took 3 years to build, but the new one is taking 24 years from the time of the Loma Prieta Earthquake which caused a portion of the original bridge to collapse. Think of it: when the old bridge is finally retired, a third of its lifetime will be occupied by building its replacement.
Re:Building a better Bay Bridge
by teej on Monday September 07, 2009 @11:11PM
(#810200)
Replacing pieces on a pre-existing structure has to be more complex than building from scratch.
Besides, they are optimizing for high availability over speed. You have to remember, the bridge is only unavailable for -5 days-. That's a feat in and of itself.
Re:Building a better Bay Bridge
by sachinag on Monday September 07, 2009 @11:23PM
(#810211)
Back in the day, they assumed that [x] number of workers would die and worked that number into the calculations. The St. Louis Arch, for example, assumed 13 people would die. Thankfully, we don't put such a small price on human life any more.
Re:Building a better Bay Bridge
by timr on Tuesday September 08, 2009 @02:14AM
(#810389)
They close it over Labor Day because it's a traditionally low-traffic time for the bridge. But hey, don't let a lack of information keep you from passing judgment on our intelligence.
Re:Building a better Bay Bridge
by krav on Tuesday September 08, 2009 @02:22AM
(#810398)
"Californians are stupider than I thought." Hmmmm....you're commenting on a site funded by a California-based incubator, probably searching on a search engine based in Mountain View. Why such a negative view?
Besides, they are optimizing for high availability over speed. You have to remember, the bridge is only unavailable for -5 days-. That's a feat in and of itself.