Re:Organic Cat Litter Chief Suspect In Nuclear Waste Accident
by Retric on Monday May 26, 2014 @07:12PM
(#7802089)
Bad instructions. Basicly someone said use brand X without specifying what about X you needed. So, someone used brand X with a different formula and never thought you needed to get approval because there was no change.
To take a random example I'm familiar with, making small modifications outside certain small bounds requires a lot of paperwork and approval. This can be something as simple as adding a tow hook to an airplane known to be good for towing. If you're lucky and the modification has been done before and somebody went through the trouble of getting the modification certified, you can take advantage of the work they've already done, greatly reducing the trouble involved as long as you can get permission from whoever got it certified. If you're doing something totally new (or something other people have done, but nobody got it certified for general use) then you have to file a form describing what you're going to do, get it approved, do the work, get the result inspected....
All this even for small aircraft where you'd be very hard-pressed to use them to kill more than two people (including the pilot) even if for some reason you had a goal of maximizing deaths.
Yet, when handling nuclear waste, apparently people can just randomly decide to completely change an important component used in the process?
Or was the change studied and approved by an engineer, but the problem was missed? The article certainly doesn't make it sound like this happened, but it could be an omission.