Additionally, you are never going to find research that discussed the magical unicorns you describe and not averages. That's not how research works.
What about it? My only claim is that the answer is complicated. I'm not claiming that 60 hours/week is a magical long term answer perfect for everyone everywhere in every industry. It's the 40 hours/week people who are making that claim.
Additionally, you are never going to find research that discussed the magical unicorns you describe and not averages.
Yes, it clearly requires a wizard riding a narwhal to compute quintiles.
Without the quintiles/ventiles/etc it's impossible to conclude that an individual can't work 60+ hour weeks. That's a simple fact about distributions. If the 100+ years of research don't provide that, it simply means that more work needs to be done because we don't know the answer.
the majority based on 10-hour workdays and an overtime schedule of four consecutive weeks
FOUR WEEKS. Did you read that bit? Productivity continues to drop after 4 weeks (with some parts of it suggesting the productivity drop stops around week 16ish).
You're a lost cause.
And again, basically all the research either you or I have found is in construction. Construction != Programming.
Last time you you were trying to claim 40-60 hours was an 'optimal' working time for manual labour and linked research yourself which showed that it wasn't.
The research linked to shows that weekly product (which is not the same as hourly productivity) can be maximized by anything from 40-60 hours, depending on the nature of the work and the duration of the project.
For example, look at Figure 16 which has numbers:
Output is maximized by 60 hour weeks.Figure 6 shows similar results, based on eyeballing the 5 and 6 day weeks (10 hours/day each) as being about 83% productivity. (Data is in a bar chart, numbers not listed.)
http://www.danzpage.com/Construction-Management-Resources/Ca...
In any case, any paper discussing averages (i.e., every source I've ever found) simply does not address the question of whether the author of the piece can productively work 60 hour weeks. That's like saying "the mean American wage is $50k/year or so, therefore it's impossible for a software engineer to earn $100k".