In cold climates, the heat could be distributed to reduce the heating load in other buildings during cold months.
Where I live (Alberta, Canada), it's continuously below freezing for at least 3 months, and often below for 2-3 months either side of that. People would be all over getting free heat from a neighbour, even if it was just a little bit.
By the way, aren't all data centres in Alberta (at least in YYC) just pumping out the heat outside?
If you have room temperature exhaust air that's useful for at least keeping rooms at room temperature. But at the moment it's just being vented.
While they could also conceivably run liquid cooling to -all- of their high temperature components (CPUs and PSUs probably) to get a higher grade waste heat stream, once again, its likely not worth the energy/money to set up that system.
This is why most cogeneration or waste heat schemes are on industrial processes - their "waste" heat is pumping out at above boiling at a minimum, and far more useful.
If the ambient air is, say, 0C (273K), and the exhaust air is 30C (303K), then the optimal efficiency for recovering energy from the exhaust is less than 10%.
In other words, if your data center uses 1MW of power, then with perfect recovery equipment, you could generate 100kW off the waste heat, reducing your total power consumption to 0.9MW. Not a particularly big win, especially since your recovery equipment is not going to be 100% efficient.
If you arrived at that 10% by just looking at the K, keep in mind that 0C is ambient temperature and already represents the lowest energy level of that system. I really believe it should be possible to take and use more of that 30° degree difference than a mere 3° off the top, even factoring in heat pumps for consolidating it and moving it around.
30° degrees of temperature difference is roughly the subcooling margin for nuclear reactors (http://en.wikipedia.org/wiki/Pressurized_water_reactor), and that's at even higher overall temperatures!
Pumping warm air outside feels really wasteful.
Is there any work on increasing efficiencies with waste heat?