News for hackers. Stuff that matters.
Re:Hyperloop Alpha [pdf] by eco on Monday August 12, 2013 @09:27PM (#6203470)
How does rail address this?
Re:Hyperloop Alpha [pdf] by tod222 on Tuesday August 13, 2013 @12:51AM (#6204051)
Prior to the use of continuous welded rail there were gaps between each 39 foot section of rail.

Nowadays with welded rail, careful compliance with construction standards is required. Slow orders are issued during heat waves and frequent track inspections are conducted to look for potential or actual sun kinks.

A good summary of the issue can be found in the Heat Orders FAQ from Virginia Railway Express. [1]

[1] http://www.vre.org/feedback/frequently_asked_questions/faq_h...

Re:Hyperloop Alpha [pdf] by jevinskie on Monday August 12, 2013 @10:12PM (#6203617)
The gaps between each section of rail can be quite large.