HSR is much cheaper than metro: you don't have to dig and you don't have to deal with all the shit which is already in the ground under the city, or with the structural risks of the dig.
The french LGV Est, also rated for 350km/h, cost ~€4b (up from an original 3.125m estimate, excluding trains) for 300km[0], or ~€13m/km -> $~17m/km. Including all costs (trains &al) according to the 2007 SNCF report the line cost €5.5b, €18m/km, ~$24m/km.
The french LGV Est, also rated for 350km/h, cost ~€4b (up from an original 3.125m estimate, excluding trains) for 300km[0], or ~€13m/km -> $~17m/km. Including all costs (trains &al) according to the 2007 SNCF report the line cost €5.5b, €18m/km, ~$24m/km.
[0] http://en.wikipedia.org/wiki/LGV_Est