Highly unlikely these data centers are going to get power from the grid.
Re:87% of the Anthropic power will come from gas and 11% fro...
by adolph on Sunday November 22, 2026 @03:09PM
(#50603398)
Sure and that's an area of abundant natural gas, not coal, so the coal part of the mix doesn't make sense. Since you asked I checked the listed sources and none seem to mention coal.
Example: Abernathy HPC campus (Fluidstack investor group; formerly TeraWulf JV) Hale County, TX · under construction · mapped at the county centroid Average regional grid mix is 16% coal, 46% gas, 0% nuclear, 37% renewable (eGRID 2023 data).
If you look at the regional grid operator's fuel mix from something like gridstatus.io [0], nuclear is about 10% and coal maxes out at less than 16%. Likewise, renewable (wind and solar) is 37% at a minimum and about 60% of the fuel mix at peak.
0. https://www.gridstatus.io/live/ercot