Re:Maryland citizens hit with $2B power grid upgrade for out...
by bogometer on Sunday May 10, 2026 @11:26PM
(#48090768)
Even in Texas' "disconnected" grid, we're seeing the same mess. Oncor is currently staring down a mind-boggling 350 GW in data center requests - to put that in perspective, that's more than triple ERCOT's entire peak demand. They’re now pivoting to a $47 billion infrastructure spree just to keep up, and they’ve already pushed through a $560 million rate hike to help foot the bill. It’s the same story as Maryland: no matter how the local market is structured, residential ratepayers are the ones getting squeezed to subsidize the massive high-voltage buildouts these AI projects require. One benefit: the increased human interaction pulls me away from the terminal. Door-to-door power salesmen now have a regular relationship with my Nest doorbell, warning me of the impending "AI-pocalypse" because ratepayers in Dallas are going to be the ones subsidizing the West Texas buildout.
[ Parent
| on HN ]
Re:Maryland citizens hit with $2B power grid upgrade for out...
by LastTrain on Monday May 11, 2026 @12:04AM
(#48090958)
Why “even” in Texas? I would say “even outside of Texas” is more appropriate.
Re:Maryland citizens hit with $2B power grid upgrade for out...
by pjc50 on Monday May 11, 2026 @08:04AM
(#48093920)
> Oncor is currently staring down a mind-boggling 350 GW in data center requests
This is an absolutely insane amount of energy, given that will have a very high capacity factor. The whole UK is one tenth of that, 35GW.
Re:Maryland citizens hit with $2B power grid upgrade for out...
by stopyellingatme on Monday May 11, 2026 @12:27PM
(#48097149)
> Oncor is currently staring down a mind-boggling 350 GW in data center requests
They could go back to the future ~413 times with that kind of buildout