Re:Belgium stops decommissioning nuclear power plants
by Manuel_D on Friday May 01, 2026 @01:18AM
(#47971522)
The same applies to nuclear power, though: when France built multiple copies of the same plant design, the first few builds were expensive but costs declined for subsequent models. It's fine to include projected costs reductions into your cost estimate, but you have to apply the same logic to competing systems.
Re:Belgium stops decommissioning nuclear power plants
by laurencerowe on Friday May 01, 2026 @03:24AM
(#47972089)
These numbers already include a projected 30% drop in costs for EPR2 across building six reactors with the first coming online in 2038.
Building a series of nuclear reactors with overlapping schedules (about one completion every year or two) in one country should help. But it’s simply far easier to find cost reductions for wind turbines which are manufactured in the thousands per year or solar panels and batteries which are manufactured in the millions.
Re:Belgium stops decommissioning nuclear power plants
by ViewTrick1002 on Friday May 01, 2026 @02:53AM
(#47971930)
They didn’t. The French nuclear buildout famously experienced negative learning by doing.
Within a generation costs lowered, but between generations they exploded.
And the reductions were to small to make a dent in how horrifyingly expensive new built nuclear power is in 2026.
Even with a 7% cost of capital that gives a levelized cost of storage of $65/MWh or an additional $33/MWh on top of the levelized cost of electricity of solar to spread it across day and night [1].
With a 4% cost of capital the still being designed EPR2 with 30% savings over Flamanville 3 comes in at €93/MWh or $110/MWh [2].
So solar costing less than $77/MWh or €66/MWh + storage should be cheaper than EPR2.
[1] https://ember-energy.org/latest-insights/how-cheap-is-batter...
[2] https://itif.org/publications/2025/09/02/lessons-from-france...