News for hackers. Stuff that matters.
Re:CO2 Batteries That Store Grid Energy Take Off Globally by jakewins on Monday December 22, 2025 @06:23AM (#46353268)
> Energy Dome expects its LDES solution to be 30 percent cheaper than lithium-ion.

Grid scale lithium is dropping in cost about 10-20% per year, so with a construction time of 2 years per the article lithium will be cheaper by the time the next plant is completed

Re:CO2 Batteries That Store Grid Energy Take Off Globally by nine_k on Monday December 22, 2025 @12:08PM (#46356037)
Li-ion and even LFP batteries degrade; given a daily discharge cycle, they'll be at 80% capacity in 3 years. Gas pumps and tanks won't lose any capacity.
Re:CO2 Batteries That Store Grid Energy Take Off Globally by jakewins on Monday December 22, 2025 @01:17PM (#46356912)
These are LCOE numbers we are comparing, so that is factored in.

The fact that pumps, turbines, rotating generators don’t fail linearly doesn’t mean they are not subject to wear and eventual failure.

Re:CO2 Batteries That Store Grid Energy Take Off Globally by westurner on Tuesday December 23, 2025 @08:58AM (#46365358)
Lithium burns toxic. Carbon based solid-state batteries that don't burn would be safe for buses.

There are a number of new methods for reconditioning lithium instead of recycling.

Biodegradable batteries would be great for many applications.

You can recycle batteries at big box stores; find the battery recycling box at Lowes and Home Depot in the US.

Re:CO2 Batteries That Store Grid Energy Take Off Globally by westurner on Tuesday December 23, 2025 @09:00AM (#46365375)
LDES: Long-Duration Energy Storage

Grid energy storage: https://en.wikipedia.org/wiki/Grid_energy_storage

Re:CO2 Batteries That Store Grid Energy Take Off Globally by westurner on Tuesday December 23, 2025 @09:58AM (#46365762)
Metrics for LDES: Levelized Cost of Storage (LCOS), Gravimetric Energy Density, Volumetric Energy Density, Round-Trip Efficiency (RTE), Self-Discharge Rate, Cycle Life, Technical Readiness Level (TRL), Power-to-Energy Decoupling, Capital Expenditure (CAPEX), R&D CapEx, Operational Expenditure (OPEX), Charging Cost, Response Time, Depth of Discharge, Environmental & Social Governance (ESG) Impact