Re:Ask HN: How do you determine which project you should wor...
by tigerthink on Monday February 02, 2009 @11:08PM
(#463485)
I came up with this, but I never use it:
Through the day, I have a fluctuating "importance threshold". During free time the threshold is very low; during work time it's high. At any given time I do the most fun thing that's above the threshold.
Through the day, I have a fluctuating "importance threshold". During free time the threshold is very low; during work time it's high. At any given time I do the most fun thing that's above the threshold.