Re:Bureau of Meteorology asked to examine $96.5M bill for we...
by pavel_lishin on Monday November 24, 2025 @11:18AM
(#46035710)
> * “$79.8 million for the website build” included the actual weather modeling*
I don't think that's a safe assumption to make.
Re:Bureau of Meteorology asked to examine $96.5M bill for we...
by 542458 on Monday November 24, 2025 @11:46AM
(#46036051)
Per https://www.abc.net.au/news/2025-11-24/bom-website-approved-... updated modelling, including the supercomputer to run the model, was included in the bill.
Re:Bureau of Meteorology asked to examine $96.5M bill for we...
by resist_futility on Monday November 24, 2025 @12:02PM
(#46036246)
Did they get a new satellite too? /s
So 95% of that wasn’t from the cost of the website redesign. “$79.8 million for the website build” included the actual weather modeling and suddenly that number looks way more reasonable.
Classic case of project scope creep stretching what redesign means until you’re including a supercomputer as part of the bill of materials.