Re:Highest bridge unveiled at more than 2,000ft above ground
by potato3732842 on Friday October 03, 2025 @09:49AM
(#45463015)
>> The 2,890-metre-long structure, which took more than three years to complete, reduces travel time between the two sides of the canyon from two hours to two minutes.
The construction timeline and travel improvement are comparable to the New River Gorge bridge, which was completed in the US in ~50yr ago back when systems were structured to and the people who ran them actually were capable of producing results.
The construction timeline and travel improvement are comparable to the New River Gorge bridge, which was completed in the US in ~50yr ago back when systems were structured to and the people who ran them actually were capable of producing results.