News for hackers. Stuff that matters.
Re:Grok Code Fast 1 by ACCount37 on Friday August 29, 2025 @07:27PM (#45070543)
That sounds like FUD.

The location of the Colossus datacenter is well known. It happens to be located in an industrial area, nestled between an active steel manufacturing plant (apparently scrap metal with an electric blast furnace, which should mean enormous power draw but no coke coal at least?), and an active industrial scale natural gas power plant.

https://www.google.com/maps/@35.0605698,-90.1562034,933m

With that, I just don't buy that it's the datacenter that is somehow the most notable consumer of fossil fuel power (or, for that matter, water) in the area.

Re:Grok Code Fast 1 by imglorp on Friday August 29, 2025 @10:15PM (#45071364)
Did you read the politico link?