Re:Google's Liquid Cooling by ajb on Monday August 25, 2025 @04:39PM (#45018698)
I remember reading somewhere that they don't operate at the level of servers; if one dies they leave it in place until they're ready to replace the whole rack. Don't know if that's true now, though.

It does sound like connections do involve water lines though. As they are isolating different water circuits, in theory they could have a dry connection between heat exchanger plates, or one made through thermal paste. It doesn't sound like they're doing that though.

Re:Google's Liquid Cooling by liquidgecka on Monday August 25, 2025 @05:15PM (#45019128)
It has not been true for a LONG time. That was part of Google early “compute unit” strategy that involved things like sealed containers and such. Turns out that’s not super efficient or useful because you leave large swaths of hardware idle.

In my day we had software that would “drain” a machine and release it to hardware ops to swap the hardware on. This could be a drive, memory, CPU or a motherboard. If it was even slightly complicated they would ship it to Mountain View for diagnostic and repair. But every machine was expected to be cycled to get it working as fast as possible.

We did a disk upgrade on a whole datacenter that involved switching from 1TB to 2TB disks or something like that (I am dating myself) and total downtime was so important they hired temporary workers to work nights to get the swap done as quickly as possible. If I remember correctly that was part of the “holy cow gmail is out of space!” chaos though, so added urgency.

Re:Google's Liquid Cooling by throwaway2037 on Tuesday August 26, 2025 @12:47AM (#45022375)

    > part of the “holy cow gmail is out of space!” chaos
This sounds like an interesting story. Can you share more details.
Re:Google's Liquid Cooling by Cthulhu_ on Tuesday August 26, 2025 @08:54AM (#45025880)
I'd love to work in a datacenter at that scale sometime, it sounds like it's like working in a warehouse where you get a list of orders, servers to remove and pick up, but at the scales of the Googles et al, that's hundreds of server replacements a day, and production lines of new servers being built and existing ones being repaired or decommissioned.

It's a fascinating industry, but only in my head as the only info you get about it is carefully polished articles and the occasional anecdote on HN, which is also carefully polished due to NDAs.

Re:Google's Liquid Cooling by cavisne on Monday August 25, 2025 @05:13PM (#45019104)
Definitely not true for these workloads. TPUs are interconnected, one dying makes the whole cluster significantly less useful.