Re:We Fell Out of Love with Next.js and Back in Love with Ru...
by PapaPalpatine on Sunday May 04, 2025 @08:40AM
(#43886383)
> Rails UI integration tests took a very long time
How many integration tests do you have? I generally only test a few core flows and then leave the rest to controller/request tests.
The broader point was basically that the Rails UI integration tests took a very long time, and required the whole system up, and we had a pretty large team constantly pushing changes. While not 100% unique to Rails, it was exacerbated by RoR conventions.
We moved much of the UI to a few Next.js apps where the tests were extremely fast and easy to run locally.