Re:Tunneling Below Second Avenue (for New Subway) by yummyfajitas on Sunday August 05, 2012 @12:18PM (#4341807)
The gateway tunnel has been postponed indefinitely. But no worries, apparently the only reason the Gateway Tunnel was necessary was because the MTA previously refused to run things efficiently.

http://transportationnation.org/2012/06/14/ny-mta-chief-says...

Also interesting: "The Regional Plan Association, which held the conference at which Lhota spoke, and other advocacy groups have expressed support for through-running—at least until Gateway Tunnel gets built."

I.e., they want to be more efficient, but only as a stopgap measure until the tunnel is built.

(Also check out Market Urbanism's blog post on the topic: http://webcache.googleusercontent.com/search?q=cache:ycccmpt... )

Re:Tunneling Below Second Avenue (for New Subway) by iwejfweoifjweif on Sunday August 05, 2012 @12:39PM (#4341860)
As some comments say on that page, there are numerous technical details as to why it isn't nearly as simple as proposed. AFAIK you can't easily run LIRR trains to NJ because only a few engines support catenary operation, everything else requires a third rail to be built.

So while this might get us a few percent increase in the number of trains for now, at the cost of a few hundred million to build out third rails in NJ (or catenaries in LIRR areas where NJ transit trains might be routed), it doesn't change the fundamental infrastructure issue given the growth of mass transit in the NYC metro area.

Re:Tunneling Below Second Avenue (for New Subway) by _delirium on Sunday August 05, 2012 @12:21PM (#4341816)
Interesting. I suppose there are not high odds that these multiple systems will ever get integrated into one regional agency, the way the various NYC subways were eventually merged into the MTA and interconnected?