Re:Ohio One Construction Timeline Update
by hedora on Tuesday March 04, 2025 @01:06AM
(#43250898)
That’s a 6 year slip in 3 years.
[ Parent
| on HN ]
So like the California high speed rail. America really can’t build things anymore.
Re:Ohio One Construction Timeline Update
by skywhopper on Tuesday March 04, 2025 @07:53AM
(#43253869)
This isn’t slowing down because of contractor issues. Intel is pulling back because no one wants their cruddy product.
Re:Ohio One Construction Timeline Update
by jollyllama on Tuesday March 04, 2025 @08:54AM
(#43254608)
Sure, but as a percentage, this sort of thing isn't that remarkable in hardware or software.
Re:Ohio One Construction Timeline Update
by lukateake on Tuesday March 04, 2025 @01:59PM
(#43258648)
The 2025 date was never realistic. It was bandied to capitalize on the chip shortage of 2021 and 2022 to try to force CHIPS Act through Congress.
The shift from 2027 to 2030 is the first material slippage -- and reflects one or two things (or both!): 14A process technology timeline and/or soft foundry demand from the fabless firms.