Perhaps one day we'll get there, but I worry that the current advancements using the rarer isotopes will end up proving to be a dead end on that road, much like so many attempts at GAI. In the short term I suspect we'd have better odds with getting thorium reactors to be economical.
https://dothemath.ucsd.edu/2012/01/nuclear-fusion/
Tritium is rare but lithium isn't, and we can make tritium from lithium using the neutrons from fusion. (We also get tritium from fission plants, which is how we'd build the first fusion reactors.)
Each fusion reaction consumes one tritium atom and produces one neutron. If that neutron hits a lithium atom, it can split that and produce a tritium atom. If everything goes perfectly and there are no losses, then you get a 100% replacement of all the tritium that you consume. If you have a 90% replacement ratio (highly optimistic), you essentially lower the cost of your tritium fuel by a factor of 10, so from $30000 per gram to $3000 per gram, or $3 MM per kilogram.
> We also get tritium from fission plants
Yes we do. Mainly from Candu reactors. There are 49 Candu and Candu-like reactors in the world, and each produces less than 1kg of tritium per year. According to [1] a 1 GW fusion power plant would consume about 55 kg of tritium per year. So you'd need to run more than 50 fission power plants to operate one fusion power plant. Most people who dream of fusion think that fission will become irrelevant, not that you'll need 50 fission power plants for each fusion power plant.
[1] https://www.sciencedirect.com/science/article/abs/pii/S09203...
Initial tritium load for a small, high-field reactor like CFS is much smaller than for ITER. And I'll note that the paper you linked has this conclusion:
> The preliminary results suggest that initial operation in D–D with continual feedback into the plasma of the tritium produced enables a fusion reactor designed solely for D–T operation to start-up in an acceptably short time-scale without the need for any external tritium source.
Ok, let's talk about that. For those who are not familiar, CFS stands for Commonwealth Fusion Systems, as startup with links to MIT. CFS aims to build a fusion reactor similar to ITER, but many times smaller, the secret sauce being that they use superconductors to achieve high magnetic fields. Back in 2022 some of the MIT guys got an ARPA-E grant to investigate the use of FLiBe to achieve atritium breeding ratio higher than 1 [1]. The results are in [2], they were published in January 2025. Here are some quotes:
> The long-term goal of LIBRA is to demonstrate a TBR ⩾ 1 in a large volume (1000 kg ∼ 500 l) of FLiBe molten salt using D–T neutron generators. Note that a full-scale LIB in an ARC-class FPP will require ∼250 000 l of FLiBe, hence the importance of understanding tritium behavior in large salt volumes.
ARC is the fusion reactor designed by CFS. This paper states that it will need 250000 liters of FLiBe. This is an insane amount. To understand how large this amount is, consider this: this ARPA-E project that took 3 years, used a quantity of 100 ml, so 0.1 liters.Anyway, what breeding ratio was achieved? 3.57 x 10^(-4), or 0.0357%. It's a long way to go from here to 1.
I'm not saying it's impossible, but too many things related to fusion are just "engineering details".
[1] https://arpa-e.energy.gov/programs-and-initiatives/search-al...
[2] https://iopscience.iop.org/article/10.1088/1741-4326/ada2ab/...
In the Solar System, the abundance of beryllium is similar to that of gold and of the platinum-group metals. On Earth, the scarcity of beryllium is less obvious only because it is concentrated in the continental crust, where it is relatively easily accessible, even if its amount in the entire Earth is much smaller.
Lead neutron multipliers would be preferable, because they only inter-convert isotopes of lead, so it is not destroyed, like beryllium.
However lead used for this purpose becomes radioactive, with a very long lifetime, unless expensive isotope separation would be used for it.
[1] https://en.m.wikipedia.org/wiki/Deuterium%E2%80%93tritium_fu...
It's not only initial investment. Half of the fusion fuel is tritium, which is one of the most expensive substances on Earth (a google search finds that the price of tritium is about $30k per gram [1]). For comparison, fission reactors need enriched uranium, and that costs only about $4000 per kilogram [2]. People have the idea that fusion produces many times more energy than fission, probably because fusion bombs have a higher yield than fission bombs. This is not true. The most typical fusion reaction involves one deuterium and one tritium and yields 17.5 MeV from a total or 5 nucleons. A fission reaction involves one neutron and one atom of U-235 and yields 190 MeV from 236 nucleons. So fusion yields about 4.3 times more energy per nucleon. That's respectable, but in the popular imagination fusion yields 100 or 1000 times more energy than fission, so the fuel cost can be neglected. Nothing could be further from the truth.
[1] https://www.google.com/search?q=tritium+price
[2] https://www.uxc.com/p/tools/FuelCalculator.aspx