First, capacity factor is a silly metric to use for this. The industry uses LCOE or system LCOE, because this is about dollars per actual TWh produced, not capacity. In other words: A capacity factor of 10% doesn't matter if building 10x the amount is still cheaper.

With that said, the wind capacity factor in Germany is 20% for onshore and 40% for offshore, so even that was wrong by a factor of 2-4.