Re:Google Funding Construction of Seven U.S. Nuclear Reactors
by conradev on Tuesday October 15, 2024 @02:14AM
(#41845449)
The theory, at least, is that making SMRs in a factory allows for a steeper and more sustainable learning curve
> Both Hermes and ETU 3.0 will be built using modular construction techniques, with reactor modules fabricated in Kairos Power's facility in Albuquerque, New Mexico, which will be shipped to Oak Ridge for assembly.
> Both Hermes and ETU 3.0 will be built using modular construction techniques, with reactor modules fabricated in Kairos Power's facility in Albuquerque, New Mexico, which will be shipped to Oak Ridge for assembly.
https://www.world-nuclear-news.org/articles/work-begins-on-f...