> As for the datacenter (I’ve racked many things with A/B power) the entire point is redundancy which this defeats the purpose of. Seems incredibly bizarre to me in so many ways.
Yes - often for the data centre you'd end up with something like [1] with 4x 2700W power supplies, providing redundancy and ample power at the same time. It does mean you need four 220v power feeds though.
[1] https://www.supermicro.com/en/products/system/gpu/4u/sys-421...
Re:Tinybox of tinygrad by George Hotz is finally entering pr...
by andersa on Tuesday August 27, 2024 @09:14AM
(#41367188)
Why is it a fire hazard if the extension cords are properly rated for this load?
Re:Tinybox of tinygrad by George Hotz is finally entering pr...
by oceanplexian on Tuesday August 27, 2024 @11:59AM
(#41368964)
Extension cords are only supposed to be used for 90 days or so, you're technically violating the NEC if you're using them in a permanent installation.
As for the datacenter (I’ve racked many things with A/B power) the entire point is redundancy which this defeats the purpose of since each PSU is not properly rated. Seems incredibly bizarre to me in so many ways.