Each launch cost almost half a billion dollars in 2010 money. The Falcon 9 is reportedly $60-65M per launch.
SLS was just more of the same, welfare for all the states with contractors who grew fat and happy off the shuttle contracts. There was no technical argument whatsoever for reusing such ancient technologies.
Each RS25 engine cost $35M to refurbish for use in the SLS. For the cost of building TEN falcon 9 engines, NASA refurbished one RS25 engine.
And yes, of course it was absurdly dangerous to rely on not just one but two solid rocket motors of which there is no control whatsoever except for slight thrust vectoring...
My understanding of the federal government of the US is that it is mainly a subsidizer of their national military-industrial complex. Something I would call: military-industrial socialism.
With that said, it is just more of the same in a different era. 1930s and the Empire State Building: to re-invigorate the economy, Eisenhower and the interstate highway system: to provide a stronger national defense, etc
Apollo/Saturn had a much more traditional staging design where the first stage booster would run then drop off, then the second stage booster would run, then drop off, etc. There exist other rockets like the Atlas which had what they called a “stage and a half” design where the center stage burned for a long time and there was an outer “ring” stage that dropped off after a shorter time while the center stage kept going.
After going to the moon, the only part of the entire Apollo/Saturn rocket that came back was the command module capsule with the astronauts and moon rocks. These were completely torched and affected by salt water and were not designed to be reused. Reentry from the moon is significantly faster than reentry from low earth orbit.
The shuttle orbiters were refurbished and reused. It was a very difficult, expensive, and time consuming process to get an orbiter ready for another flight.
All of that is to say that the picture is blurry for the shuttle regarding first stage reusability. Yes the SRBs and orbiters were reused and were lit at launch. The ET was in use at launch but discarded. In my opinion it’s sort of not that interesting to argue what is and isn’t first stage on the shuttle because the elements just don’t map cleanly.
The design of the system with the SRBs, tank, and orbiters being adjacent to each other is considered by many to have been too dangerous in retrospect. This design was a factor in both shuttle disasters - the SRB shooting fire at the ET causing it to explode on Challenger and cracked foam falling away from the ET during launch and hitting the leading edge of the orbiter wing for Columbia. If they were stacked vertically rather than adjacent, those specific failure modes would not have been possible.