Re:Australia to build the largest solar power plant by Reason077 on Friday August 23, 2024 @03:32AM (#41326890)
> "Bahawalpur is desert terrain, having high dust count, therefore, the efficiency of panels were reduced by 40%. It required 30 people to clean panels with 15 days to restore the panels back to their full capacity, which reduced production of installed 100MW plant to below 18 MW.[26][27]"

Solar farms are often installed in arid, dusty environments, so it's not unusual that they require regular cleaning. Various automated solutions have been developed for this (ie: panel cleaning robots). Weird that they wouldn't have considered all this when planning the solar farm.

> "Each of the 400,000 installed panels required one litre of water to clean. A 15 days cleaning cycle required 124 million litres of water"

Huh? If there's 400,000 panels and cleaning each panel requires 1 litre, that's 400,000 litres of water per cleaning cycle. Not ideal, but it's certainly not 124 million litres!