CURRENT TIME: 9:45
NEXT TRAIN: 9:42
STATUS: ON TIME
In the rest of the country Amtrak blames freight companies for most delays (https://www.amtrak.com/on-time-performance), and frankly I am inclined to agree with them. Amtrak does not own those lines and does not have priority on them, and the freight companies don't give a shit about anyone. See for example https://www.propublica.org/article/trains-crossing-blocked-k... and the rest of ProPublica's excellent series on the industry.
Or to put it another way, it sounds like DB has a lot of problems that it could fix, but Amtrak has a lot of problems that are out of its control.
I bet, however, it's not uniformly distributed and some lines are late more than others.
Hopefully that 95% is them being honest about the current state, while they push higher.
Sure. But "with a nearly perfect on-time performance of 99.3% on Hudson, Harlem, and New Haven Lines," there isn't much room to hide problems. (LIRR is 96.3%.)
The point is we have systems that have been well built and well maintained. They just don't get coverage because they just work. (The LIRR is far from perfect, mind you. But it's apparently outperforming the DB. You have to get to some of the worst routes during peak conditions to get in the neighbourhood of DB's systemic numbers.)
I deal with late trains around two-thirds of my trips. Sometimes up to two hours of delay.
SBB CFF FFS has similar numbers, except it defines "on time" as "within 3 minutes"[1] which is of course harder to achieve.
[1] https://company.sbb.ch/en/the-company/responsibility-society...
New York’s Metro-North and LIRR have 95%+ on-time rates [1]. (EDIT: On time is defined as less than 6 minutes late [2].)
[1] https://www.metro-magazine.com/10217862/metro-north-lirr-exp...
[2] https://www.osc.ny.gov/files/reports/pdf/report-9-2025.pdf