If your confused about the terminology, $300,000 is a smaller number than $450k. “Saleable square footage” means net of elevator shafts, hallways, etc….
The premise of the post you replied to is that land isn't the primary cost. For a building that puts 500 units on an acre, the cost attributable to land is only $20,000/unit even when the land is $10 million/acre.
You replied trying to add in construction costs and regulatory requirements, which was the point -- that's where most of the cost is, because regulations make construction bureaucratic and labor-intensive, where they don't prohibit it outright.
> “Saleable square footage” means net of elevator shafts, hallways, etc….
Which is why I only allocated half of the footprint of the lot to livable area to begin with. If you could allocate the entire acre of footprint to living space, one acre of land could have more than 20 units of 2000 sq ft per floor and a 50 story building would have 1000+ units instead of 500+.
In the real world it is probably going to be a lot more complex as you mentioned.
Your method of calculating costs is also flawed. Things like loan interest, taxes and realtor fees are a percentage of the other costs, not a fixed amount. If construction and regulatory costs were lower then you could take out a smaller loan and pay less interest etc.
The dominant costs here are the premium on sites zoned for tall buildings, which is the cost of zoning rather then cost of land and could be alleviated with the stroke of a pen, and construction costs which are themselves significantly higher than necessary as a result of regulatory requirements.
Yes, as a thought experiment, you could build an infinitely tall building which pushes the per unit cost for land to zero. That’s not what’s happening in SF, and it has nothing to do with labor. Another obvious point: building tall buildings requires more engineering, more expensive materials, more difficult labor, and more safety than small ones.
Your argument is all pointless hypotheticals. Put up or shut up: show me the numbers that say labor is driving the price of housing in SF. You’ve done nothing to support the idea that labor is driving the actual costs of real housing built in SF.
That isn't the cost of the land, it's the cost of the zoning rules that prohibit density. And, more to the point, construction costs, because now you have a problem where the only place you're allowed to put multi-story buildings already have multi-story buildings and to be profitable you need construction costs low enough to justify replacing a 10 story building with a 20 story building instead of replacing a single-family home with a 10 story building for the same benefit. Which, as you point out, costs more because the building has to be taller, and also costs more because you have to knock down the existing building and do twice as much construction to add the same number of units. Multiplying the effect of any increase in construction costs.
> Yes, as a thought experiment, you could build an infinitely tall building which pushes the per unit cost for land to zero.
It doesn't have to be infinitely tall, buildings tall enough to make even high land prices irrelevant are routinely built in practice.
> You’ve done nothing to support the idea that labor is driving the actual costs of real housing built in SF.
Your claim was that the primary cost was land, but the primary costs are zoning, construction costs and their interaction.
Lumping zoning in with “construction costs” makes zero sense. Everything in some sense fits that definition. To be clear, zoning costs definitely are not labor costs. The way you are using these terms is incorrectly conflating things.
Again because you don’t seem to get it: the post I was responding to blamed (union) labor for the price of construction. Clearly incorrectly.
The cost of land in SF is less than $10 million/acre:
https://www.statista.com/statistics/1376626/land-price-in-se...
> an acre near anywhere it makes sense to put a 50+ storey building
What is "makes sense"? Are condo units available in Palo Alto for anywhere near $20,000? It makes sense anywhere that the cost of land is high.
> Plus at most only about 2/3 of the floor plate is saleable square footage.
So actually more than the 1/2 used in the numbers above.
> Realtor fees, taxes, surcharges, local improvement fees, etc., and everything else legally mandated is another $250k on top. Builder overhead, insurance, interest on the bank loan, a margin for delays, etc., is at least another $200k.
Half of these aren't part of the list price and the other half are just other words for "zoning and construction costs".
> Even if land cost was zero as well, it would still be at least $450k per unit to break even.
You now seem to be arguing that the land isn't the primary cost.