The tricky bit is that if there is a bug in the change, the VIP might suddenly be busy with other work.
And as you said, a smart VIP is there in the room, suggesting things get done. Explicitly not writing things down in emails.
That works once. Then the next time you go to each desk, the person there has already checked with their boss, and says "my boss says you need to go through the correct channels and if you don't like it, you need to talk to him."
That's why you have a VIP with you. If he's not her boss's boss, the whole thing is a lot less likely to work.
Re:It Takes 6 Days to Change 1 Line of Code
by cheatercheater on Saturday May 19, 2012 @06:40AM
(#3995635)
Wishful thinking. Each of those people has a thousand other things to do than to hold your hand all day long. Only works for things that are super-duper-important.
Additionally.. Going to "tell" on your buddies all the time and holding "the grownups" over them is terrible whinery. Everyone on the playground hates kids who do that.
I've gotten software changes that usually take two months to trickle through the system through in a day. You have to spend all day doing it, though, and so does your VIP.
But if it's really that important . . .