Re:Boeing's 737 MAX Software Outsourced to $9-an-Hour Engineers
by datavirtue on Wednesday March 13, 2024 @06:42PM
(#39698479)
The umpteenth comment trilling on as though MCAS was built by contractors when it was explicitly stated in the article that it was developed in-house by Boeing employees.
The problem was that they didn't outsource the design spec. I doubt an externally developed design would be so contrary, with a flippant we'll document it and include it in the short brush up training.