The upfront cost of doing that with a propane generator is about a half that of a battery + solar system (it's about a third if you go with battery + solar + generator, which is more comparable to a grid connection).
However, the maintenance and fuel costs of the generator mean that the solar will be much cheaper (and quieter!) to operate.
If the income based pricing is $100 / month, and the net energy / base connection cost is $0 / month (assuming an exactly sized solar system), then it'll take about 200 months for the generator to pay itself off. That's 16 years, which is a bit longer than the system will last, though replacing a generator costs about half what I've assumed above.
So, there's a pretty low upper limit to the amount they can screw with these fees before it's economically (though not necessarily environmentally) rational thing for individuals to just cut the cord and let the power grid death spiral.
To be clear, I think the income-based fee is a bad idea, but I just don't think it changes the calculus on installing solar. I have also had conversations about this specific question with a friend who has a PhD in urban planning, lives in CA, and is in the process of installing solar panels. It's possible she's wrong, but everything she says lines up with what I have read.
It sounds like you're referring to the net metering changes, which are separate from the income-based fee. That does change the calculus, obviously (which is why they grandfathered existing installs for 20 years).